Document Type
Statistical Report
Publication Date
6-1977
Abstract
As part of the National Pollutant Discharge Elimination System the U.S. Environmental Protection Agency has required that Florida Power Corporation (FPC) demonstrate that .operation of the Anclote Power Station does not adversely affect the aquatic community of the Anclote River and Anchorage. In response to this requirement FPC initiated the Anclote Post-operational Ecological Monitoring Program and contracted with Westinghouse Environmental Systems Department to conduct the plankton monitoring portion of the program.
Rights Information
Scholar Commons Citation
Westinghouse Electric Corporation, Environmental Systems (PA) and Florida Power Corporation, "Anclote Power-station Post-operational Plankton Monitoring Program Volume I: Technical discussion" (1977). Reports. 1.
https://digitalcommons.usf.edu/basgp_report/1