Document Type

Statistical Report

Publication Date

6-1977

Abstract

As part of the National Pollutant Discharge Elimination System the U.S. Environmental Protection Agency has required that Florida Power Corporation (FPC) demonstrate that .operation of the Anclote Power Station does not adversely affect the aquatic community of the Anclote River and Anchorage. In response to this requirement FPC initiated the Anclote Post-operational Ecological Monitoring Program and contracted with Westinghouse Environmental Systems Department to conduct the plankton monitoring portion of the program.